Town of Devon WWTP

Town of Devon WWTP - devon-feature
  • Client

    Town of Devon

  • Size

    23 ML/day

  • Completed

    2020

  • Location

    Devon

  • Delivery Models

    Design/Bid/Build

  • Market

    Water/Wastewater Treatment

Town of Devon WWTP - Devon-intro

Wastewater Treatment Plant – Devon

The existing Wastewater Treatment Plant in Devon required an upgrade due to the aging nature of their existing facility and technology. The upgrade project included a sequenced build including the construction and commissioning of the new headworks, followed by the demolition of the old headworks structure. The new secondary treatment was constructed and commissioned prior to demolishing the old secondary treatment process and remaining infrastructure.

The new headworks included fine screens for influent filtration followed by primary filtration/separation through Salsnes Filters. The secondary treatment process included bioreactors/aeration tanks, Membrane Bioreactors as well as Rotary Drum Thickeners and Centrifuges for Solids Handling. UV Filtration closes out the secondary process.

The new facility encompassed provisions for adding primary and secondary filtration equipment as the Town of Devon’s population grows.

Get Us Working for You

If you have a project youd like to speak to us about, or would like to learn more about our service capabilities, click the link below.

Form Template
Select a Form Template
Available fields in the selected template:
This field is required.
Invalid email format.
File size is too big, maximum allowed size is 1MB.
Some of the fields are not filled or invalid.
Templates Library
Loading, Please wait...
The Library cannot be open, please try it again later.