Town of Oakville
110,546 SF
2001
Oakville, ON
Design/Bid/Build
Transportation
The Town of Oakville contracted with Maple Reinders to construct a new Public Works/Parks Operations facility on a new site. The new building consolidated several operations into one central location that is operated more efficiently.
The consolidated facility includes maintenance garage workshops, maintenance yard, storage depot, central office and dispatch, truck scale, receiving facilities, central stores, tool cribs, salt domes, fueling and employee facilities.
Operations and layout were designed for optimum traffic flow and enhance cost efficiency, consistent with the functional building program. The construction incorporated leading edge concepts to enhance operational efficiencies and vehicular circulation such as high and long span bays, stanchion mounted fume extraction system, skylights, translucent overhead doors and clerestory glass.
The facility consists of 23,433 SF of office space, while 77,112 SF is dedicated to the fleet garage, storage, workshops and operations garage. The existing pre-engineered buildings were also renovated and expanded. New construction included the new vehicle and equipment storage garage, constructed adjacent to the other facilities.
Grey Container – do not delete or move.
Maple Reinders was hired to provide Design-Build services for a new warehousing and truck/container marshalling yard. The new facility is a 20,000 SF stand-alone building on 4.7 acres in Bolton Ontario.
Maple Reinders, with its familiarity in developing land in the burgeoning Bolton market, was awarded the contract to design and build a new office and warehouse distribution facility for NALS.
View All
Industrial and Advanced Manufacturing
Legacy Business Centre houses 193,910 sf industrial condos over two buildings. Built by Maple Reinders for Beedie Construction, the individual condos range from 11,000 sf to 17,000 sf.
Institutional
The construction of the school took place while the existing Westbrook School (built in 1953) was in use for an entire school year. The contract included abatement and demolition of the existing school which was undertaken during the summer break.
Water/Wastewater Treatment
Design-Bid-Build contract by Glenmore Ellison Improvement District to construct a pump station and reservoir as part of the Ellison Separation upgrade works