Making Waves Swim School Inc.
6,660 SF
2014
Milton, ON
Design/Bid/Build
Commercial
Maple Reinders has completed three projects for Making Waves Swim School. The first one was a renovation to their facility in Milton, ON, which consisted of the complete demolition and refurbishing of the existing change rooms, parent viewing area, and the removal and replacement of the pool deck complete with water filtration/circulation system. A smaller 500 SF addition was also included to house the new pool equipment and mechanical systems.
Maple Reinders was given nine weeks to complete the majority of the project scope, and pool facilities remained operational during construction. The project was completed ahead of schedule and classes resumed earlier than planned.
Maple Reinders has since completed two additional projects for Making Waves Swim School, including an interior fit-up for new commercial office space in 2017; and redevelopment of existing commercial space for the school’s new 7,850 SF facility in Mississauga, ON in 2018 (pictures on this page are from this latest project).
View All
Maple Reinders undertook the Phase 2 and 3 extensions to their existing facility in Calgary. Which included construction of the 134,000 SF freezer/cold storage warehouse utilized reinforced concrete strip footings and pads, structural steel, insulated metal panels, SBS roofing.
Oxford Riverbend Building 6 is a 79,000 sf warehouse, manufacturing and office facility in Burnaby, BC.
Maple Reinders completed the Design-Build contract for the construction of this two-storey youth centre for the Trinity Baptist Church, located in Kelowna, British Columbia.