Kelowna Wastewater Treatment Facility, Stage II Phase I

Kelowna Wastewater Treatment Facility, Stage II Phase I - Kelowna-WWTF-Stage-II-Phase-1-Featured
Gradient
  • Client

    City of Kelowna

  • Size

    71 ML/day

  • Completed

    2012

  • Location

    Kelowna, BC

  • Delivery Models

    Design/Bid/Build

  • Market

    Water/Wastewater Treatment

Kelowna Wastewater Treatment Facility, Stage II Phase I - Kelowna-WWTF-Stage-II-Phase-1-Intro

McKenzie Highlands Middle School – Calgary

Maple Reinders has completed several major upgrades and expansions since the 1990s for the Kelowna Wastewater Treatment Facility. The most recent contract included upgrades to the existing wastewater treatment plant, including construction of a new screening facility, two new primary clarifiers, conversion of two existing primary clarifiers to equalization tanks, a new bioreactor with two process trains, modification of the existing bioreactor aeration system to fine bubble, two new secondary clarifiers, RAS & WAS Pump Stations, a fermenter, a maintenance building, a DAF, a centrifuge, a new odour control system, an expanded UV disinfection system, and miscellaneous ancillary works. This project included installation of large diameter pipe.

Maple Reinders was also responsible for supply and installation of process equipment including submersible mixers, fermenter, primary and secondary clarifier mechanisms; UV system, DAF, centrifuge, grit screening system; membrane and coarse bubble diffusers, macerators, pumps, blowers, and chemical systems.

Previous Project

McKenzie Highlands Middle School

Intended for children from grades 5-9, the school is a two-storey core design, with modular classrooms and has a durable exterior finish with the approved capacity of 900 students.

Next Project

Kelowna Airport Terminal Expansion

A two-storey non-combustible expansion to the existing Air Terminal Building, which included a 17,760 SF addition to the main floor of the terminal and a 2,798 SF addition to the existing second floor.

Get Us Working for You

If you have a project you would like to speak to us about, contact us today.

Form Template
Select a Form Template
Available fields in the selected template:
required field.
Invalid email format.
Some of the fields are not filled or invalid.
Templates Library
Loading, Please wait...
The Library cannot be open, please try it again later.