Kelowna Integrated Water – Phase 1

Maple Reinders was sub-contracted by Emil Anderson Construction (EAC) to collaborate with their design-build team on the water reservoirs and pump stations’ scope of work.

This project’s purpose was to separate the agricultural and domestic water systems to provide a sustainable water supply for the local agriculture and clean drinking water for the surrounding households.

Maple Reinders’ work included building new and/or upgrading a total of 5 pump stations and reservoirs (Jean Road Reservoir and Pump Station; Stellar Pump Station Upgrades; Vector Road Pump Station Decommissioning; Lower Crawford Pump Station Retrofit; and Dall Road Reservoir) which connects to the maze of over 50 kilometers of new underground water mains installed by EAC.

Previous Project

Nationwide Self-Storage, Kamloops

Maple Reinders constructed Nationwide Self-Storage’s new facility with an eco-friendly Car Wash facility in Kamloops, British Columbia.

Next Project

Town of Devon WWTP

The project included a sequenced build including the construction and commissioning of the new headworks, followed by the demolition of the old headworks structure.

Get Us Working for You

If you have a project youd like to speak to us about, or would like to learn more about our service capabilities, click the link below.

Form Template
Select a Form Template
Available fields in the selected template:
required field.
Invalid email format.
Some of the fields are not filled or invalid.
Templates Library
Loading, Please wait...
The Library cannot be open, please try it again later.