Kawartha Dairy
60,000 SF
2017
Bobcaygeon, ON
Construction Management
Food and Beverage
Producers of dairy and ice cream products, Kawartha Dairy required a new building to store their final products and to further expand operations. The building consists of a 18,440 SF freezer, 10,658 SF of refrigerated storage, with the balance of the 60,000 SF facility consisting of 10 truck docks and supporting storage.
The project also included a fire protection water storage tank with septic drain fields, a 44kV transformer, diesel fire pump, fueling station and power lines. The Maple Reinders team was able to reduce the facility’s electrical running costs by approximately 30% by utilizing a compressor rack system rather than the standard straight compressors
View All
Food and Beverage, Life Sciences
Maple Reinders undertook the Phase 2 and 3 extensions to their existing facility in Calgary. Which included construction of the 134,000 SF freezer/cold storage warehouse utilized reinforced concrete strip footings and pads, structural steel, insulated metal panels, SBS roofing.
A new access road was built for trucks to two new dock levelers, including new approach and gate access and the south parking lot expansion for trailer and truck parking.
Get Us Working for You
If you have a project you would like to speak to us about, contact us today.
Contact Us