Skip Navigation

Gordon Food Service, Edmonton Distribution Centre Expansion

Gordon Food Service, Edmonton Distribution Centre Expansion - GFS-Edmonton-featured
Gradient
  • Client

    GFS Properties Ltd.

  • Size

    110,515 SF

  • Completed

    2015

  • Location

    Edmonton, AB

  • Delivery Models

    Design/Build

  • Market

    Food and Beverage

Gordon Food Service, Edmonton Distribution Centre Expansion - GFS-Edmonton-intro

Gordon Food Service Expansion – Edmonton

Maple Reinders was awarded a Design-Build contract by GFS for the expansion of their existing facility in Edmonton. The existing facility was expanded on the west, north, and east elevations and included: dry warehouse expansion (34,434 SF), new cooler warehouse (7,999 SF), new freezer warehouse (37,157 SF) addition to ICP freezer (12,131 SF) and an additional 17,287 SF for Intercity Packers.

A new access road was built for trucks to two new dock levelers, including new approach and gate access and the south parking lot expansion for trailer and truck parking. Complex coordination was required on this project as the existing building and parking continued to operate 24/7, and Maple Reinders had to tie into this building for water, fire protection systems and refrigeration systems.

Gordon Food Service, Edmonton Distribution Centre Expansion - GFS-Edmonton-square1
Gordon Food Service, Edmonton Distribution Centre Expansion - GFS-Edmonton-square2
Gordon Food Service, Edmonton Distribution Centre Expansion - GFS-Edmonton-square3
Gordon Food Service, Edmonton Distribution Centre Expansion - GFS-Edmonton-square4

Previous Project

Kelowna Airport Terminal Expansion

A two-storey non-combustible expansion to the existing Air Terminal Building, which included a 17,760 SF addition to the main floor of the terminal and a 2,798 SF addition to the existing second floor.

Next Project

Churchill Meadows Christian Church

Constructed the Churchill Meadows Christian Church, which is a worship facility with a 650-seat theatre-style auditorium that includes an expansive podium and backstage green room facilities.

Get Us Working for You

If you have a project you would like to speak to us about, contact us today.

Form Template
Select a Form Template
Available fields in the selected template:
required field.
Invalid email format.
Some of the fields are not filled or invalid.
Templates Library
Loading, Please wait...
The Library cannot be open, please try it again later.