College of New Caledonia
25,144 SF
2018
Prince George, BC
Design/Bid/Build
Institutional
Maple Reinders was awarded this project as General Contractor by the College of New Caledonia (CNC) located in Prince George, British Columbia. Maple Reinders constructed the new CNC Heavy Mechanical Trades Facility – an educational training facility for students of heavy machinery mechanics, involved integrated architecture and interior design, graphics, and wayfinding. The facility will be used by students for Repair and Maintenance training.
The building program includes a large multifunctional workshop and several dedicated technology laboratories. Constructed and designed to offer an abundance of natural light, this one-storey single tenant non-combustible 25,144 SF structure, with a 1,615 SF enclosed mezzanine level, connects to the existing campus building.
Material selection is intentionally industrial, robust, and appropriate to the building’s purpose, with local wood products – including a heavy timber roof – being showcased in public areas, achieving LEED® Gold certification. The upper portion of exterior walls will include laminated veneer lumber panels. The building will be sprinkled throughout and monitored by a fire alarm system. A freestanding car park canopy is constructed as part of the project.
This project achieved all the owner’s sustainable goals and has both a high level of construction and design.
Grey Container – do not delete or move.
Maple Reinders was selected to replace a small commercial building structure with a five-storey Office and Retail building, otherwise known as Allendale 5.
Maple Reinders constructed a six-storey parkade for the City of Kelowna in their downtown core, the Memorial Parkade includes City office space in addition to 566 stalls.
View All
Industrial and Advanced Manufacturing
Legacy Business Centre houses 193,910 sf industrial condos over two buildings. Built by Maple Reinders for Beedie Construction, the individual condos range from 11,000 sf to 17,000 sf.
The construction of the school took place while the existing Westbrook School (built in 1953) was in use for an entire school year. The contract included abatement and demolition of the existing school which was undertaken during the summer break.
Water/Wastewater Treatment
Design-Bid-Build contract by Glenmore Ellison Improvement District to construct a pump station and reservoir as part of the Ellison Separation upgrade works
Get Us Working for You
If you have a project youd like to speak to us about, or would like to learn more about our service capabilities, click the link below.
Speak to the Right Team